-
-
November
218:30 am - 1:00 pmSCC Workday (Fall)
# annual
- rake leaves
- clear leaves in east and west side window wells
- check and clear gutters
- drains are clear (auger if needed)# one time
- fix pew(s?)
- install downspouts (south side of building)
- install Becket condensate pump + PVC to drain
- cap old drains next to main doors
- finish entry way wall
- fix kitchen window
- fix snow blower (South Side Hardware)
